How much does it cost to hire an excavator with an operator?
It depends on machine size, how long you need it and how far it has to travel. A 5 tonne on a half-day job prices very differently to a 30 tonne on a week-long basement. Ring Blake with the job, the access and a rough timeframe and he will give you a real number rather than a range that means nothing.
What size excavator do I need?
Rough guide, and it is only a guide: footings, trenches and detail work suit a 5 tonne. A house pad or a standard site cut wants 14 tonne. Basements and deep bulk dig want the 30 tonne. Tight access down the side of a house is posi track territory at 4.5 to 6 tonne. Prime runs all of them, so the right machine comes to the job instead of whichever one was free.
What size excavator do I need to dig a basement?
Realistically a 20 to 30 tonne machine. Anything smaller and you are moving the same dirt several times, which costs more in hours than you save on the machine rate. Prime runs a 30 tonne Komatsu and two 20 tonne Liebherr drotts for exactly this work.
How many cubic metres does a truck and dog hold?
A truck and dog typically carries around 14 to 16 cubic metres, though the limit is usually weight rather than volume. Wet clay loads out heavier than dry sandy fill, so the same truck takes less of it. For planning, assume fewer loads of heavy material, not more.
Do you need a licence to operate an excavator in NSW?
If Prime is doing the work, no — the machine comes with our operator and that is our responsibility. If you are dry hiring, you need to be competent and appropriately trained for the machine, and the site needs to meet SafeWork NSW requirements. Check with SafeWork NSW for your situation rather than taking a website's word for it.
Do you need council approval to excavate?
Often yes, and it depends on depth, proximity to boundaries, whether you are affecting drainage and what your local council requires. Most building works that include a site cut already have it covered in the DA. If you are unsure, ask your builder or your council before booking plant — not after.
What is a drott?
A drott is a tracked loader — it pushes and loads in a single pass, rather than slewing like an excavator. On open bulk earthworks it shifts volume faster than an excavator because it is not tracking back and forth. In confined or deep work the excavator wins. Prime runs two 20 tonne Liebherr drotts and a 12 tonne Caterpillar.
What is a posi track?
A compact track loader — a skid steer that runs on rubber tracks instead of wheels. The tracks spread the weight, so it floats over soft ground and lawns that a wheeled machine would tear up, and it fits through gaps a conventional machine cannot. Prime runs seven Takeuchi posi tracks between 4.5 and 6 tonne.
How much does it cost to remove soil from a site?
Three things drive it: volume, whether the material is clean or contaminated, and truck access. Clean fill is cheaper to dispose of than contaminated spoil, and a site a truck and dog can reach is cheaper than one needing smaller trucks. Prime runs seven combos in-house, so there is no sub-hire mark-up on the cartage.
How long does a site cut take?
A standard residential cut is usually one to three days on site, depending on depth, soil and how far the spoil has to go. Rock, restricted access or a deep benched cut will stretch it. Blake will tell you the timeframe at the quote rather than after he has started.
What happens if we hit rock?
We bring a hammer attachment and keep going. Rock is priced separately because nobody can see it from the surface — you will be told the moment we find it, with a price, before any extra work starts.
Can you get a machine down the side of my house?
Usually. Measure the narrowest point — normally a gate post, meter box or downpipe, not the gate itself — and tell us the number when you call. The posi tracks handle a standard side passage, and boards go down over anything the machine crosses.